|
Project Profiles Industrial/Commercial Environmental Mitigation/ Contract List
|
Project Detail
Project: Triple 10 x 6 Box Culvert This culvert begins as a curving structure collecting water flow from 5 each 66" diameter concrete pipes and transitions to a long straight triple 10' x 6' cast in place concrete box culvert. The culvert extends 1360 feet across a new land reclamation project and carries a max water flow of 1300 cfs from Eucalyptus Hills Creek and surrounding storm drains to discharge into the San Diego River. A job designed and built rolling form system was used to construct the culvert. Approximately 4200 cy of concrete and 700,000 lbs of reinforcing steel were used in this project.
|
CA License No. 411338 A, B