Water Ski Show Floats - 175 This unique float was constructed for SeaWorld for use as a floating center stage for a water ski show. The float measured about 60 ft x 30 ft and was constructed of timber and plywood and supported on foam filled pontoons. |
 |
Phase I - Plant 4 Modernization - 101 Work included the construction of a new precast/prestressed concrete pier 60' wide by 800 long. Longitudinal caps were placed for a gantry rail system for a 40 ton gantry crane. Mechanical and electrical shore systems were provided at several utility mounds along the pier. |
 |
Oceanside Harbor Dock Replacement - 132 This project involved the installation of pile supported caps and precast concrete breakwater panels to create a protected marina and boat yard with new Travel Lift piers. |
 |
Concrete Breakwater @ South Bay Boat Yard - 145 This project involved the installation of pile supported caps and precast concrete breakwater panels to create a protected marina and boat yard with new Travel Lift piers. Additionally, a new sheetpile bulkhead was installed on the eastern side of the yard for the boatyard's shoreside expansion. |
 |
Berthing Pier & Public Pier - 196 This waterfront project is located in San Diego Bay near Crosby Street Park. The project involved the removal of an existing 28' x 574' timber and the construction of 2 new concrete piers. The Berthing Pier is a 32' x 780' concrete pier with a full timber fender system. |
 |
10th Avenue Marine Terminal - 243 This waterfront project is located at 10th Avenue Marine Terminal and involved a major seawall repair around the entire 4,639lf waterfront perimeter of the facility. The existing cyclopean seawall averaged 50' tall with the toe under 38' of water. |
 |
Waterfront Improvements - 261 This project included structural steal upgrades to the steel superstructure of the old 1920 Navy Fuel Pier. Old product lines were removed from under the pier and new product lines were installed under and on top of the pier. |
 |
Repair Pier Bravo FY02 Special Project R1-98 NAS North Island - 315 This Pier is commonly referred to as the Ammunitions Pier and is located at the mouth of San Diego Harbor on westside of NAS North Island. With aftermath of 9/11, added security and use of this pier was radically increased. |
 |
San Diego Marriott Seawall Repair - 343 Work involved the repair of 1200 lineal feet of a steel sheetpile seawall. 30 foot aluminum cofferdams were utilized to provide a dry work area due to water quality issues, since a third of the wall repair was in the tidal zone. |