Project Detail

Project: Berthing Pier & Public Pier
Owner: San Diego Unified Port District
Start date: 8/4/1992
Finish date: 8/17/1993
Value: $4,340,158

This waterfront project is located in San Diego Bay near Crosby Street Park. The project involved the removal of an existing 28' x 574' timber and the construction of 2 new concrete piers. The Berthing Pier is a 32' x 780' concrete pier with a full timber fender system. The Public Pier is a 18' x 700' concrete pier that is open to the public from the park. As part of the park improvements, this project included construction of various concrete features including walkways and benches and landscaping. Mechanical and electrical utilities were installed on the piers and in the park. This project also included 315 feet of shoreline revetment.

<  Back to Marine Construction Projects

Office 619-276-4401         FAX 619-276-0717         10108 Riverford Road, Lakeside, CA 92040
Copyright © 2009 Marathon Construction Corporation, All Rights Reserved
CONTRACTORS AND ENGINEERS
CA License No. 411338 A, B