Projects

Project Profiles

Marine Construction

Industrial/Commercial
Construction

Environmental Mitigation/
Reclamation/Habitat
Restoration

Heavy Civil/Earthwork

Dredging

Project Awards

Contract List
Download .pdf of all contracts

Project Detail

Project: Southbay Land Outfall/Revegetation of Mitigation Area 2
Owner: International Boundary Water Commission
Start date: 5/29/1992
Finish date: 1/21/1993
Value: $392,947

Remove a non-permitted rubblemound flood control structure and grade a 2.5 acre river bottom area and restore area to riparian forest. In order recycle the rubble and to keep offroaders out of the site, we designed a rubble section barrier and placed 1700 lineal foot of this barrier around three sides of the project. This design became the design standard for rubble barriers for future restoration projects in the Tijuana River Valley Regional Park.

<  Back to Environmental Mitigation/Reclamation/Habitat Restoration

Office 619-276-4401         FAX 619-276-0717         10108 Riverford Road, Lakeside, CA 92040
Copyright © 2009 Marathon Construction Corporation, All Rights Reserved
CONTRACTORS AND ENGINEERS
CA License No. 411338 A, B